New Kitchen

Don't be fooled by the title in this blog. The kitchen is not completely new, but we did have to get a new floor because our refridgerator leaked. This all happened back in September. What we thought was going to be a two week project turned into an almost two month project! We were able to move everything back into the kitchen on October 30th! Here are pictures of the MESS!


The small area we thought we were dealing with

About 4-5 layers under the tile that Robb had to get up



Finally all the layers are up and ready for new flooring
New paint on the walls and cabinets-floor is ready to be put down